Commit Graph

3 Commits

Author SHA1 Message Date
bac3a99db3 Release v0.1.0: fill CHANGELOG date
Some checks failed
CI / Quality (push) Failing after 2m22s
Release / Linux AppImage (push) Failing after 1m34s
[0.1.0] — TBD → 2026-05-03 immediately before tagging.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-03 09:52:28 +02:00
919517c3ce Release prep v0.1.0: LGPL-3.0-or-later + real Gitea host URL
Closes the two release-prep items called out in the Phase 5 closure
paragraph (a3d35a7).

License: LGPL-3.0-or-later. Chosen to align with Qt 6's LGPLv3, which
keeps the AppImage's relinkability obligation (PLAN.md §12) satisfied
and avoids version-mixing friction with upstream Qt. Two files at the
repo root:

  - LICENSE      — LGPL-3.0 text (the project license).
  - LICENSE.GPL  — GPL-3.0 text the LGPL-3.0 explicitly incorporates
                   ("This version of the GNU Lesser General Public
                   License incorporates the terms and conditions of
                   version 3 of the GNU General Public License…").

framework/php/composer.json: "license": "proprietary" → SPDX
"LGPL-3.0-or-later". CHANGELOG Notes section updated with the actual
license + LICENSE/LICENSE.GPL pointer.

Repo URL: every `gitea.example/<org|you>/php-qml` (and `<org>/<repo>`
in docs/packaging-linux.md) replaced with the real
`src.bundespruefstelle.ch/magdev/php-qml`. Touched README.md,
CHANGELOG.md (compare + tag links), docs/getting-started.md,
docs/packaging-linux.md (build-appimage --update-info example +
latest.json appcast example).

PLAN.md: status line bumped to "v0.1.0 ready to tag — LGPL-3.0-or-later
license shipped, repo URL fixed". Phase 5 closure paragraph rewritten
to record both items resolved (rather than pending).

Only remaining manual edit at tag time: CHANGELOG `[0.1.0] — TBD` →
`[0.1.0] — YYYY-MM-DD` (per Keep-a-Changelog), and the actual
`git tag v0.1.0 && git push --tags` itself, which triggers
.gitea/workflows/release.yml. Per the branching memory, releases land
on main — merge dev → main first.

Verified: `make quality` from framework/skeleton green (16 tests, 45
assertions; PHPStan + cs-fixer clean; maker snapshots match).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-03 09:50:15 +02:00
26a2b3771b Phase 5 sub-commit 4: release readiness — README + CHANGELOG + status line
README.md rewritten to reflect actual onboarding (clone → php-qml-init
→ make dev / make appimage) instead of the planning-stage placeholder.
Phase status checklist now reflects 0–4a green and 5 in progress.

CHANGELOG.md created at repo root following Keep-a-Changelog
conventions, with a v0.1.0 entry that summarises Phases 0–4a plus the
Phase 5 polish work (DevConsole, php-qml-init, editor configs,
hot-reload docs). Date is TBD; tagging is the user's call.

PLAN.md gains a Status banner so it's obvious at a glance which phase
the implementation tracks against the design.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-02 21:30:08 +02:00